The problem
Disconnected frontline communication, manual paper trails, and unverified on-site claims create chronic operational blindspots across leadership:
Costly Construction Delays on Multi-Megawatt Sites
Contractors, pile-driving teams, and electrical crews working in silos create milestone delays and grid penalty fees.
String Wiring Defects & Loose Inverter Terminations
Improperly crimped solar connectors or untested inverter strings cause ground faults and substantial generation loss upon commissioning.
Unverified Material Deliveries Across Vast Solar Fields
High-value solar panels and central inverters arrive on site without serialized scan verification, leading to theft and damage claims.
What we build
FieldTick configures purpose-built, offline-first mobile execution modules and back-office pipelines engineered specifically for this operational reality:
Milestone-Based EPC Construction Workflow
Daily progress checklists for pile foundation, tracker alignment, panel mounting, and electrical junction box cabling.
IV-Curve & Inverter Commissioning QA Suite
Engineers capture Voc, Isc, and thermal imaging data directly on mobile, flagging resistive hot spots before energization.
Asset Serialization & Delivery Gatekeeper
Scan pallet barcodes upon arrival at solar farm perimeters to verify BOM quantities against ERP purchase orders.
Expected outcomes
Leading enterprise deployments demonstrate rapid, predictable improvements across operational cost efficiency and frontline productivity benchmarks:
Structured QA workflows eliminate rework during grid synchronisation and statutory inspector audits.
Complete digital record of every inverter, combiner box, and PV string uploaded for bank finance approval.
GPS and time-stamped milestone photos ensure contractor payments match verified site progress.