Metro Elevators: Scaling 12,000 annual inspections with offline sync

Technicians perform safety inspections in underground elevator pits with zero network latency, automatically synchronizing logs once above ground.

99.8% SLA Adherence · March 2026
Metro Elevators: Scaling 12,000 Annual Inspections with Offline Sync

Prior to deploying FieldTick, Metro Elevators managed frontline coordination through fragmented email updates, end-of-day spreadsheet consolidation, and disconnected messaging threads. This introduced severe latency between on-site field events and backend decision-making.

The operational challenge

Disconnected beat execution and manual administrative reporting created significant blindspots across regional territories:

  • Territory Coverage Blindspots: Inability to verify whether scheduled visits were completed as planned or delayed by routing bottlenecks.
  • Paperwork Drag on Frontline Capacity: Representatives spent up to 90 minutes each evening re-entering job sheets and purchase orders from physical notes.
  • Quote-to-Cash Inefficiencies: Manual transcription errors led to billing reconciliation delays stretching over several weeks.

The FieldTick solution architecture

By standardizing frontline execution on FieldTick's offline-first mobile operating system, Metro Elevators replaced manual procedures with verified, automated workflows backed by SQLite local persistence and deterministic queueing.

  • Geofenced Proof-of-Presence: Visits automatically log arrival and departure coordinates within a validated 50-meter perimeter, eliminating fake check-ins without battery drain.
  • Offline-First Digital Work Orders: Dynamic forms with barcode scanning, mandatory photo attachments, and digital customer e-signatures allow complete job sign-offs even with zero cellular signal.
  • Bi-Directional ERP Sync: Background synchronization updates inventory levels in SAP/Salesforce, triggers automated invoice creation, and pushes real-time SLA metrics to management dashboards.

Measurable business impact

Within 90 days of rollout across regional operational hubs, Metro Elevators achieved validated operational improvements:

  • 99.8% SLA Adherence achieved across frontline teams.
  • 100% elimination of end-of-day manual reporting.
  • Zero lost field records thanks to client-side database journaling and offline synchronization.
Continue Exploring

More customer stories & operational blueprints

Your Team's Success Story

Ready to build your next case study with FieldTick?

See how your frontline teams can eliminate paperwork, accelerate route density, and prove daily execution.

Book a Demo